Read about our journey.Declining rainfall and increasing demand have strained existing water supply systems in rural areas of Western Australia, especially in areas that have solely relied on rainwater. This has made efficient and durable pipelines essential for moving potable water and has driven the initiation of water supply schemes to create equitable access to water for regional and rural areas.
In the lead up to the construction of the Greenbushes to Kirup pipeline, Water Minister Dave Kelly noted that, “Historically, many smaller southwest towns have sourced drinking water from local dams, however, the impact of climate change means rainfall is no longer a reliable water source for many communities.
“Despite declining rainfall, Western Australians can have confidence in long-term water supply security as we continue to investigate new water sources where previous sources are becoming unviable.”
The Warren Blackwood Regional Water Supply Scheme serves the towns of Manjimup, Bridgetown, Nannup, Greenbushes, Boyup Brook, Balingup, and Hester in the Southwest region of Western Australia. In early 2022, it expanded to include Mullalyup and Kirup following the completion of the Greenbushes to Kirup pipeline.
The 17-kilometre pipeline – made up of over 2,600 lengths of pipe – transports potable water from Greenbushes, passing through Balingup and extending north. Clover played an integral part in the planning, sourcing and supply of the pipeline that could meet the unique demands of the project.
The Greenbushes to Kirup pipeline marked a milestone in the history of Western Australia’s water infrastructure development, being the first instance of Oriented PVC (PVC-O) PN25 pipe used in the region. With the project requiring a solution that could withstand extreme water pressure, Clover was the only supplier that could meet this unique need and supply a pipeline solution durable enough to ensure long-term water security – helping the area move away from costly water carting processes.
PVC-O is known for its strength, ductility and impact resistance thanks to a process called Molecular Orientation, while the product is also 100% recyclable. Molecular Orientation stretches PVC molecules to align them in the same direction, dramatically improving the material’s strength and durability while maintaining its original benefits. This alignment can double PVC’s tensile strength, making PVC-O exceptionally resistant to traction, fatigue, impact, and offering greater flexibility.
In a remote and heavily forested area, the choice of PVC-O allowed for reduced trench dimensions during construction – enabling faster implementation and reduced environmental disturbance – while the inherent durability of the material promises less maintenance in the long-term.
The PVC-O PN25’s successful implementation sets a precedent for future projects, demonstrating its superior strength and flexibility under the challenging conditions inherent in WA’s often harsh and challenging rural environment.
This project was significant in many ways – bringing much-needed water security to the region but also showcasing the capabilities of one of our most advanced product offerings in a challenging and remote environment.
The remote nature of the project location added a unique layer of complexity that Clover excels in solving for – necessitating careful logistical planning and coordination to successfully transport materials over significant distances.
Clover’s collaboration with Water Corporation was instrumental in overcoming these obstacles, with the WA team providing technical support and data to confirm OPVC PN25’s suitability for the area’s demanding conditions. Despite the geographical isolation, the project proceeded on schedule, showcasing Clover’s ability to plug in to complex infrastructure projects and ensure our role facilitates smooth construction.
Having delivered solutions like these for the past five years in Western Australia, Clover has seen significant year-on-year growth in the number and scale of projects. Relying on its national logistics network as well as both international and local manufacturers, the team has quickly built a reputation for delivering exceptional service and solutions on time and to budget, regardless of distance, terrain or project complexity.
Pat McCaffrey
General Manager WA
Get in touch with Pat McCaffrey for support with the planning, sourcing, and supply of your next project today.
Pat McCaffrey
General Manager WA
Thanks for getting in touch, we will respond as quickly as possible.
If you have an urgent matter, please call your nearest Clover branch.
Clover's Oriented PVC pipe (PVC-O) undergoes a rigorous manufacturing process to ensure world-leading quality in potable water, recycled water and wastewater applications.
Supporting a modern community hub with an innovative solution for potable and recycled water.
We supplied an innovative project solution to the Riverstone community through the design and delivery of our unique Central Axis Maintenance Shaft.
Get in touch with our team for additional information on product pricing, technical data, project support and more.
Get in touch with our team so we can support the planning, source, and supply of your next project.
We endeavour to reply within 1 business day.
Thanks for getting in touch, we will respond as quickly as possible.
If you have an urgent matter, please call your nearest Clover branch.